1. News
  2. Life
  3. Road Maintenance and Infrastructure Work Continues on the Golden Horn Bridge

Road Maintenance and Infrastructure Work Continues on the Golden Horn Bridge

featured
Share

Share This Post

or copy the link

Road Maintenance and Infrastructure Work Continues on the Golden Horn Bridge

Yol Bakım ve Altyapı Çalışmaları Haliç Köprüsü'nde Devam Ediyor

As part of the asphalt renewal works that started at 23:00 yesterday evening, teams continue to work intensively on the D-100 Highway Haliç Bridge. The middle bridge, which also includes the metrobus route, was closed to traffic in the Mecidiyeköy direction. Drivers were directed to the side road by traffic signs and illuminated buoys placed on the Haliç Bridge.

Haliç Köprüsü'nde Yol Bakım ve Altyapı Çalışmaları Devam Ediyor

Istanbulites who wanted to go to work were having a hard time in traffic due to the closure, and the traffic congestion extended to Bahçelievler. Traffic congestion continued on the Golden Horn Bridge and surrounding areas in the morning hours. In aerial footage, the traffic congestion on the Golden Horn Bridge can be clearly seen.

The planned completion date for the renovation work on the Golden Horn Bridge has been determined as 05:00 on July 8. It is important for drivers to be careful and choose alternative routes during the work period.

Road Maintenance and Infrastructure Work Continues on the Golden Horn Bridge

Your email address will not be published. Required fields are marked *

Login

To enjoy New7 privileges, log in or create an account now, and it's completely free!

Follow Us!